Key Points

Finishing a basement in the South Denver Metro has starting costs between $100,000 and $200,000+, or about $150 to $250+ per square foot, with the finish level driving the budget far more than square footage alone.
Because the lower level is built from scratch, the price covers new framing, plumbing, electrical, HVAC, and finishes, all coordinated during an upfront design phase.
A fixed price locked in before construction and a clearly chosen finish level lets you budget your basement with real numbers instead of a ballpark.

From Concrete to Comfortable: The Real Number

Wondering what it really costs to finish your basement? Not sure if the number in your head matches what finishing a basement actually takes?

In this post, you’ll learn what a basement finish costs here in Highlands Ranch, what drives that number up or down, what you get at each finish level, and how long the work takes.

By the end, you’ll know how to budget for your basement finishing project with real numbers instead of a low-end ballpark you found on HomeAdvisor.


What Does It Cost to Finish a Basement?

Finishing a basement in the South Denver Metro has starting costs between $100,000 and $200,000. The per square foot costs start between $150 to $250+, depending on the layout, systems, and finish level.

Our recent basement finishes have averaged around $117,500.

Because we build the lower level from scratch, that price covers new framing, plumbing, electrical, HVAC, permits, inspections, and finishes, not a quick cosmetic refresh of a space that was already livable.

Each of our basement projects includes a bathroom.

Basement Finishing Costs By Finish Level

Most basement projects fall into one of three finish levels, and the level you choose is what sets your budget.

Pricing is always based on your specific design and features, not square footage alone, but the ranges below show where projects usually start.

Finish levelPriceWhat it includes
Streamlined full finishStarts around $100,000+ (~$150/sq ft)A from-scratch layout with usable living space, standard finishes, a dedicated electrical subpanel, and the option to add a bathroom.
Fully custom-builtStarts around $150,000+ (~$200/sq ft)A custom layout with egress windows, plumbing relocation, custom storage, upgraded finishes, and a bathroom with a higher level of finish.
High-end, feature-rich buildStarts around $200,000+ ($250+/sq ft)Significant customization with detailed bathrooms, built-ins, entertainment areas, and upgraded systems like steam showers or whole-home water filtration.

What Drives the Cost of a Basement Finish

The biggest cost driver is the finish level you want, not the square footage by itself.

Two basements of the same size can land at very different prices, because we price around your specific design and features.

For homeowners D&D Remodeling works with in Littleton and Centennial, these are the factors that move the number the most:

  • How custom the layout is.
  • Whether you add a bathroom, a kitchenette, or a wet bar.
  • Whether plumbing and electrical have to be relocated from the builder’s rough-ins.
  • The finish materials, from flooring to tile to cabinetry.
  • Anything we uncover behind the walls once demolition starts.
  • If we need to add code-compliant egress windows.

We don’t build budget, minimal-scope basements that just make the space usable.

We build full living spaces, so the price reflects a fully designed floor rather than the cheapest path to drywall.

When we do run into something unexpected, like a foundation crack or mold, we have a built-in contingency to handle the problems we typically see, and we talk you through any fix before we move ahead.


Permits, Code, and the Systems Behind the Walls

A basement finish is essentially building a new floor inside your home, so the code work matters as much as the finishes.

During the design phase, we coordinate electrical, plumbing, HVAC, and egress together so everything works as one system.

We’re a Colorado Class C residential contractor, fully licensed and insured for the work.

A few things almost every basement needs:

  • A dedicated electrical subpanel.
  • Egress windows, which our more custom basement builds include.
  • Plumbing relocation, because builder rough-ins are rarely in the right spot.

We always pull permits for basement finishes. It isn’t negotiable.


What a Finished Basement Is Actually Worth

A lot of cost guides sell basements on a resale ROI percentage, and that’s not how we look at it.

We only take on projects for homeowners across the South Denver Metro who want to live in their home, not flip it.

The real return is a floor that finally does what your house couldn’t before, whether that’s a guest suite, a lounge, a home office, a gym, or all of them at once.


How Long Does a Basement Finish Take?

Timeline tracks closely with finish level, since a more custom build means more systems and selections to coordinate.

  • A streamlined full finish usually takes about 6 to 8 weeks.
  • A fully custom build runs closer to 8 to 10 weeks.
  • A high-end, feature-rich build can take 8 to 12+ weeks.

We put a strong emphasis on the design phase up front, where we dial in the layout, selections, and scope, and then lock in your final price before construction starts.

One lead stays on your project from demo to final walkthrough, so the schedule and the details stay consistent the whole way through.


Stop Guessing What Your Basement Will Cost with D&D Remodeling

We design and build your basement from the ground up with an in-house, W2 crew, and we finalize your layout, selections, and scope before any demolition starts. From the first wall to the final walkthrough, one lead stays on your project, so the plan you approved is the plan you get.

When you’re ready to see your real numbers, fill out our contact form today or give us a call, and we’ll start with a design phase that locks in your final price before we swing a hammer. 

Frequently Asked Questions

Is design-build remodeling more expensive than traditional remodeling?

Design-build remodeling isn't automatically more expensive than the traditional approach. Your number gets locked in after the design phase, so there are no surprise change orders or creeping budgets pushing the final cost past what you agreed to. The only thing that changes it is a change you decide to make to the scope.

How long does a design-build remodel take?

A design-build remodel's timeline depends on the size and scope of the work, with projects running between 2 and 14 or more weeks once construction begins. Larger projects, or ones with structural changes, take longer. Timelines also tend to move faster when an in-house crew is on site every workday and the next phase is already lined up.

Do I need an architect to work with a design-build firm?

You don't need to hire your own architect to work with a design-build firm in most cases. The design and the structural planning happen in-house, and any engineering a project needs is coordinated as part of the design phase. A Colorado contractor license even covers structural work like removing load-bearing walls, so there's no separate professional for you to line up.