Key Points

A design-build whole-home remodel moves through seven steps, and every design decision is closed before demolition begins.
Whole-home rarely means gutting the house, and far more often means several connected rooms or the entire main floor rebuilt together.
Because the same company designs, prices, and builds the project with its own employees, the price holds unless you change the scope.

A Whole-Home Remodel Run by One In-House Team

You’ve been in this house for years, you love the neighborhood, and you’re not going anywhere, but the main floor no longer works the way your family actually lives. So who is actually accountable when a project touches five rooms at once?

In this post, you’ll learn the seven steps a design-build whole-home remodel moves through, what “whole-home” really means on a project like this, why your price is settled before demolition, and what changes when the company that designed your remodel is also the company building it.


How Does a Design-Build Whole-Home Remodel Work?

A design-build whole-home remodel works in seven steps: an initial phone call, an in-person consultation that ends in a proposal, a contract and deposit, a design phase, material selections, construction, and a final walkthrough.

One company handles the design and construction, so the layout, selections, and fixed price are all settled before demolition begins.

The design-build part matters because it removes the handoff.

There is no designer drawing a plan for a builder who then prices it differently, and no gap between the two for your budget to fall into.


The Seven Steps, From First Phone Call to Final Walkthrough

The seven steps fall into three stages: three steps to decide whether we’re the right fit and put a real number in front of you, two steps to settle every design decision, and two steps to build it and confirm the result with you before we leave.

Each stage has to close before the next one opens, which is why a whole-home project with us feels front-loaded compared to a contractor who starts demolition and figures the rest out on the way.

Steps One Through Three: The Call, the Consultation, and the Contract

The first three steps are designed to get you a detailed, project-specific price before you’ve committed to anything beyond a conversation.

At D&D Remodeling, we start with a phone call to hear what you want to do, talk through project details, and get your budget expectations on the table.

If that call goes well, we schedule a 60 to 90-minute visit to your home, where we walk the space, take detailed measurements, talk through your goals, and give you real-time feedback on scope and budget while we’re standing in the rooms.

You leave that consultation with a detailed proposal, a comprehensive project cost estimate, and a 2D layout of the proposed space.

Step three is the contract.

Once you’ve reviewed and approved the proposal, a deposit secures your spot on our schedule and engages us for design and selection services.

At that point, you receive your timelines, payment schedule, and access to our construction management software.

Steps Four and Five: Design and Selections

In design, we produce floor plans and elevations so you can understand the new space, then take your feedback and revise the plans until the layout is right.

We start with 2D floor plans to confirm the layout and features of the space, then move into mood boards centered on the major finishes, working down to smaller items like cabinet pulls and sconces once the big decisions are settled.

We send material samples directly to your home so you can look at tile and stone in your own lighting rather than under the fluorescents of a warehouse, and for larger items like full countertop slabs, we send you to see them in person.

Selections close when everything is chosen.

Our team then orders your products, prepares the construction plans, and obtains any permits required for the project.

Steps Six and Seven: Construction and the Final Walkthrough

Construction doesn’t start until your materials have been delivered and your plans have been approved, so the demolition date is set by readiness rather than by the calendar.

Before we begin, you’ll be introduced to the Lead Remodeler and Apprentice assigned to your project, and that team will be on site each day working through the build.

They submit daily logs summarizing what was completed, and both owners read every log each evening to verify that the design features are being implemented.

Step seven is the final walkthrough, and it’s the step we care about most.

Your Lead Remodeler personally coordinates it, leaves your home cleaner than the crew found it, and takes care of any finishing touches you ask for.

We walk the finished rooms with you and put blue tape on anything that isn’t right, then fix every taped item before we leave, because the last five percent is where the details either come together or don’t.


What a Whole-Home Remodel Actually Includes

A whole-home remodel with us is rarely a full gut of the house.

Far more often it means several connected rooms or the entire main floor rebuilt together, and sometimes it means something like three bathrooms at once rather than one contiguous space.

Most of these projects don’t start life as whole-home projects at all.

They usually begin as a kitchen or a bathroom and grow as the scope expands into the rooms around it.

That growth is a real decision, not an accident, and it’s worth understanding before you sign anything.

New flooring in the kitchen tends to pull the trim, doors, lighting, and paint along with it, and homeowners in Littleton and Centennial tell us they went wider to achieve a consistent look across the level rather than mismatched finishes meeting at a doorway.

Part of our job during design is helping you decide how far to carry it.

Sometimes that means running the flooring through the entire level, and sometimes it means introducing a clean transition between materials so the project reads as a cohesive whole without looking like it stopped abruptly.

Knowing when to expand the scope and when to hold it is a large part of how we approach these projects, and you make that call during design rather than in the middle of demolition.


Why Your Price Is Set Before Demolition Starts

Your price is set after design and before demolition because by then every decision that could affect the number has already been made, allowing us to commit to a single figure instead of revising it as the work goes on.

We’re a fixed-price company.

Your price doesn’t change unless you change the scope.

We’ll also tell you honestly that we’re often more expensive than other bids you’ll get, because we account for more than other contractors do, rather than quoting low and finding the rest later.

Our design phase exists to make every possible decision before we swing a hammer, and the clear scope of work that comes out of it is what gets us ahead of most change requests.

When something does come up mid-project, whether it’s a request from you or something we find behind a wall, we give you a written change order with a price so the two of us decide together before anything proceeds.

There’s also a contingency built into the price to cover the kinds of problems we typically run into on older homes, which is part of why the number is higher and part of why it holds.


What Changes When Our Own Crew Does the Work

When our own crew does the work, the people who quoted your project are the people building it, so nobody on site is waiting on another company’s schedule or working from a plan they’ve never seen.

Our tradespeople are W2 employees with little to no subcontracting, and you work directly with the owners rather than through a layer between you and them.

The practical version of that is a crew in your house Monday through Friday, 7:00 to 3:30, that doesn’t leave until the job is done, and one dedicated project lead who stays on your project from start to finish.

Our timelines tend to be shorter than those of general contractors who coordinate subcontractors, simply because we’re not waiting for anyone else to become available.

Continuity also changes what it’s like to have people in your house for weeks at a time.

Families with young children in Greenwood Village and Lone Tree tell us that seeing the same familiar faces every day is the part they value most.

We’re deliberate about protecting the house while we’re in it.

We put down floor protection in all traffic areas, usually starting at the main entry point, and we use the garage as a staging area to contain dust and heavier work.

During heavier demolition, we’ll often shut off the furnace so dust doesn’t get pulled into the HVAC system and circulated throughout the rest of the house.

We do a daily cleanup and reset so the home stays reasonably clean and accessible, and every Friday we do a more thorough reset before the weekend.

For a project this size, though, we’ll usually recommend you move out if you can.

A whole-home remodel is genuinely disruptive: furniture has to come out of the affected rooms, the kitchen goes offline, and there are days you can’t walk through the work area to reach the stairs.


The Whole Main Floor, Handled Start to Finish by D&D Remodeling

The takeaway is the order: everything is decided before anything is demolished, and one company carries your project from that first phone call through the final walkthrough.

That’s what lets you plan around a whole-home remodel instead of reacting to it. If you’re thinking about reworking your main floor or several connected rooms, fill out our contact form or give us a call today. We’ll start with a conversation and go from there.

Frequently Asked Questions

Do you pull permits for a whole-home remodel?

Permits depend on what your project actually touches. For basement finishes, we always pull them; for kitchens and bathrooms, it's more negotiable depending on the scope. When a project involves plumbing, electrical, or structural changes, we handle permitting as part of the job and acquire any required permits during the selections stage before construction starts.

Do I have to source and provide my own materials?

No. We walk you through the design and selection process, and once you’ve reviewed and approved your selections, we handle purchasing all the materials and coordinate delivery to your home before your project starts. That’s also why construction doesn’t begin until everything has arrived, so the house isn’t sitting half-built while a finish gets sorted out.

Is there a warranty on the work?

Yes. Every project includes a one-year craftsmanship warranty covering the work we complete. We also stand behind our work beyond that window, and it isn’t unusual for us to come back well after a project is finished to take care of small things, because we’d rather you feel taken care of long term. We’re in the process of formalizing and expanding our warranty structure.

Read More From D&D Remodeling